Tuesday, April 28, 2020

Atlantikwall Regelbau 666 - Bunker for Infantry Observation Post with Sm...

Atlantikwall Regelbau 666 bunker Type is Infantry observation post (Beobachtungsstände) with small turret from the second world war,
the iron turret have be removed, blasted the turret off. Using DJI Mavic Mini Drone - DJIMini This bunker Type was designed by the Luftwaffe for 'German Air Force'. how is a Regelbau Before and during World War II, the Wehrmacht built several standardised bunkers and weapon positions in Germany and German-occupied countries. These buildings were called Regelbau, i.e. standardised buildings. The Regelbau (German for "standard design") were a series of standardised bunker designs built in large numbers by the Germans in the Siegfried Line (German: Westwall) and the Atlantic Wall as part of their defensive fortifications prior to and during the Second World War. Following the occupation of German territories west of the Rhine, fortress engineers began the construction of the Siegfried Line in 1936. In doing so they were able to benefit from their earlier experience of bunker construction. In compliance with the Versailles Treaty, they had already built the Wetterau-Main-Tauber position and Neckar-Enz position before 1936. When, in 1936, construction started on the Siegfried Line itself, they were able at the outset to utilize designs from the two earlier fortifications. From these existing plans, fortress pioneers rapidly developed improved bunkers that were built from 1937. This building phase was named the Engineer Construction Programme and was characterized by bunkers built to B1 standard thicknesses (see above). Since the thickness of these structures was soon considered to be too weak and because there was a large number Regelbau designs (and hence confusion), new types were developed and implemented from 1938. These new designs were achieved largely by simplifying and reducing the number of Regelbau types. This new building phase was called the Limes Programme. Development of Regelbau designs from 1936 to 1940 The fortress engineers were no longer in charge of construction; instead Organization Todt (OT) took over, promising Hitler it would deliver the number of structures he wanted. Plans for the Limes Programme did not envisage the inclusion of the cities of Aachen and Saarbrücken and they therefore ended up in front of the planned line of fortifications. That changed in 1939 with the Aachen-Saar Programme. From 1939, yet more new Regelbau bunkers were designed for the construction programme that saw increases in the construction thicknesses. From then on, only bunkers that met the in "B new" and "A" standards were to be built. With the outbreak of the Second World War on 1 September 1939, priorities for the construction of the Siegfried Line changed. The renewed shortage of raw materials led to the development of a new series of Regelbau designs, the so-called wartime standard designs or Kriegsregelbauten. After the "lavish" Regelbauten of the Aachen-Saar Programme, the final construction phase was dominated by massive financial constraints. For example, observation cupolas and flank firing positions were no longer provided and the rooms were smaller. Expansion of construction projects from 1941 to 1944 In 1940 work was ordered on a number of construction projects in Western Europe. Amongst the first were the Dover Strait guns begun in July 1940 and included Todt Battery. Building began in February 1941 on the Saint-Nazaire submarine base Following the first effective commando raid in March 1941 Operation Claymore and with the planning of Operation Barbarossa, Hitler decided in June 1941 to strengthen the west against possible attacks. The Channel Islands were chosen to become major fortifications, followed in 1942 with the order to build the Atlantic Wall. A mass of equipment was needed, cement, sand, gravel and steel to construct the concrete fortifications, weapons and armour plate for defence and hundreds of thousands of workers. To offset shortages, equipment from French and other occupied armies were incorporated in the defences, casemates designed for non-german artillery, anti tank and machine guns and the use of turrets from obsolete tanks in tobrukstand pill boxes (tobruk pits). The labour came from an expansion of the Organisation Todt, who contracted with building construction companies from Germany and occupied countries to undertake the work. The OT provided them with equipment, supervisors and labour. Labour comprised skilled volunteers, engineers, designers and supervisors, who were paid and treated well, second came volunteer workers, often skilled technicians, such as carpenters, plumbers, electricians and metal workers, again these workers were paid, took holidays and were well treated. Next came unskilled forced labour, paid very little and treated quite harshly, lastly came effective slave labour, paid so little, badly fed and treated very harshly. #Atlantikwall #Regelbau #Bunker

No comments:

Post a Comment